Best practicesCreated on: 2 April 2026

Barcelona (Spain): new transport links for reaching new uses

Goal 3.4

Reducing the negative impacts of periods of peak activity in the City Port territory by any means possible.

Challenge(s)

How can the impacts on city traffic caused by the port’s road transport logistics be minimised?

Best Practice

To advance the implementation of port-city redevelopment projects, plans for improving access to the port must always consider the local urban mobility plans. This must include plans for the transport of people and goods, as well as all different modes of transportation. Planners should be familiar with existing construction bylaws covering roads shared by both port and urban transport (width of roadways, dimensions of traffic circles, etc.), the possibility of expanding or separating each transport mode, technological solutions for real-time management of traffic flows, etc. In Barcelona, the port’s strategic plan ensures consistency between urban mobility plans and port connections by creating a strategic plan in collaboration with Catalonia Government.

Case Study

Cet article est réservé aux adhérents de l’AIVP

Intégrez le premier réseau mondial dédié aux relations ville-port et bénéficiez de services exclusifs comme notre Veille Stratégique.

Adhérer à l’AIVP

All the best practices

A valuable decision-making tool to help implement the AIVP 2030 Agenda in your territory. Join the network to access all best practices!

Contact us